Layout, mount, clamp. The Raptor process trades a rail system's worth of steps for four.

01

Layout

Mark mount locations directly on the roof deck or rafters — no rail lines to snap first.

02

Mount

Set the Raptor Mount at each marked point — fixed height for standard decks, adjustable for irregular ones.

03

Set the Module

Place the module onto the mount, aligned to the next one in sequence.

04

Clamp & Bond

Torque the Raptor T-Clamp down fully before setting the next module — bonding is handled in the same motion.

FIG.01 — MOUNT DETAIL
Raptor mount installed at roof edge

Watch It Go In

Install Videos
Coming Soon.

A full install walkthrough and side-by-side comparison against a traditional rail install will be published here. In the meantime, the step-by-step installation manual is in the Technical Resource Center.