On the Roof
Installation
Layout, mount, clamp. The Raptor process trades a rail system's worth of steps for four.
01
Layout
Mark mount locations directly on the roof deck or rafters — no rail lines to snap first.
02
Mount
Set the Raptor Mount at each marked point — fixed height for standard decks, adjustable for irregular ones.
03
Set the Module
Place the module onto the mount, aligned to the next one in sequence.
04
Clamp & Bond
Torque the Raptor T-Clamp down fully before setting the next module — bonding is handled in the same motion.
FIG.01 — MOUNT DETAIL
Watch It Go In
Install Videos
Coming Soon.
A full install walkthrough and side-by-side comparison against a traditional rail install will be published here. In the meantime, the step-by-step installation manual is in the Technical Resource Center.
Installation Manual